Originally constructed in 1896 and designed by renowned architect O’Neil Ford, the Denton County Courthouse restoration represented a meticulous effort to preserve one of Texas’ historic civic landmarks while modernizing critical building systems for long-term functionality. Working alongside ArchiTexas, JRJ Construction completed a full-scale historic restoration that carefully balanced preservation craftsmanship with structural and operational upgrades.

The scope of work included the complete removal and re-pointing of mortar joints throughout the building, extensive limestone cleaning and patching, new stone replacement, reconstructed stone steps and capstones at all entrances, and full perimeter foundation waterproofing. Structural improvements included new steel reinforcement within the tower, restoration of cupolas and finials, and installation of a new non-fading black slate roof at the tower base and corner cupolas. Interior restoration efforts featured reconstructed wing corridors, replicated curly pine wainscoting, new wood trim and windows with traditional weight pockets and sash cords, restored and replicated historic hardware, plaster restoration, encaustic tile flooring installation, and complete refinishing of all wood surfaces throughout the courthouse. Modern upgrades included new HVAC, electrical, and fire alarm systems while preserving the architectural integrity of the building.

Originally estimated at $3.4 million, JRJ Construction delivered the project with an initial bid of $2,873,213, allowing Denton County to preserve substantial contingency funds while also accommodating nearly $600,000 in owner-directed upgrades and additional restoration scope throughout the course of the project.